Re: Boeing 737MAX Production/Delivery Thread 2018

Sun Aug 12, 2018 4:52 pm

6308 1D002 42989 N739EX 737-9 Thai Lion Air
Image6308 1D002 42989 N739EX 737-9 Lion Air by 737 MAX Production, on Flickr

7050 1C331 43830 B-1118 737-8 Xiamen Airlines
Image7050 1C331 43830 B-1118 737-8 Xiamen Airlines by 737 MAX Production, on Flickr

7060 1B114 44456 N326RP 737-8 American Airlines
Image7060 1B114 44456 N326RP 737-8 American Airlines by 737 MAX Production, on Flickr

7062 1A611 61631 B-1152 737-8 Shanghai Airlines
Image7062 1A611 61631 B-1152 737-8 Shanghai Airlines by 737 MAX Production, on Flickr

7068 1C333 43858 B-1139 737-8 Xiamen Airlines
Image7068 1C333 43858 B-1139 737-8 Xiamen Airlines by 737 MAX Production, on Flickr

7070 1B653 61443 B-1120 737-8 Shandong Airlines - Painted
Image7070 1B653 61443 B-1120 737-8 Shandong Airlines by 737 MAX Production, on Flickr

7110 1A314 737-8 Norwegian & 7073 1A311 42836 LN-BKC 737-8 Norwegian
ImageA pair of Norwegian MAX's by 737 MAX Production, on Flickr

7077 1A312 42834 EI-FYI 737-8 Norwegian - Engines Installed
Image7077 1A312 42834 EI-FYI 737-8 Norwegian by 737 MAX Production, on Flickr

7083 1A745 62873 B-1165 737-8 China Southern - Engines Installed Now
7123 737-8 Air China
ImageOutside FAL by 737 MAX Production, on Flickr

7093 1B115 44457 N328RR 737-8 American Airlines
Image7093 1B115 44457 N328RR 737-8 American Airlines by 737 MAX Production, on Flickr

7095 1C703 60034 TC-LCC 737-8 Turkish Airlines
Image7095 1C703 60034 TC-LCC 737-8 Turkish Airlines by 737 MAX Production, on Flickr

7096 1D051 44161 737-9 Copa Airlines - Engine Runs
Image7096 1D051 44161 737-9 Copa Airlines by 737 MAX Production, on Flickr

7105 1A612 737-8 Shanghai Airlines
Image7105 1A612 737-8 Shanghai Airlines by 737 MAX Production, on Flickr

7115 1A023 42574 N8723Q 737-8 Southwest Airlines
Image7115 1A023 42574 N8723Q 737-8 Southwest Airlines by 737 MAX Production, on Flickr

7118 1A211 737-8 Lion Air
Image7118 1A211 737-8 Lion Air by 737 MAX Production, on Flickr

7128 1C704 60035 TC-LCD 737-8 Turkish Airlines
Image7128 1C704 60035 TC-LCD 737-8 Turkish Airlines by 737 MAX Production, on Flickr

7145 737-8 Smartwings
Image7145 737-8 Smartwings by 737 MAX Production, on Flickr

7148 737-8 Xiamen Airlines
Image7148 737-8 Xiamen Airlines by 737 MAX Production, on Flickr

5668 1A002 36989 N8702L 737-8 Southwest Airlines
Image5668 1A002 36989 N8702L 737-8 Southwest Airlines by 737 MAX Production, on Flickr

Boeing is using the stalls that the Test Frames did their re-work in as new flight line stalls

7064 1C332 43857 B-1137 737-8 Xiamen Airlines
Image7064 1C332 43857 B-1137 737-8 Xiamen Airlines by 737 MAX Production, on Flickr

7065 1A743 43951 B-1122 737-8 China Southern
Image7065 1A743 43951 B-1122 737-8 China Southern by 737 MAX Production, on Flickr

Storage Areas for incomplete MAX's -
Compass Rose
7100 1A313 737-8 Norwegian
7108 1B116 44458 N338RS 737-8 American Airlines
7105 1A612 737-8 Shanghai Airlines
7113 1A613 737-8 Shanghai Airlines

ImageCompass Rose by 737 MAX Production, on Flickr

Taxiway Bravo
7128 1C704 60035 TC-LCD 737-8 Turkish Airlines
7115 1A023 42574 N8723Q 737-8 Southwest Airlines

ImageCrowded Taxiway Bravo by 737 MAX Production, on Flickr

ImageTaxiway Bravo by 737 MAX Production, on Flickr
 
SXDFC
Posts: 2594
Joined: Sun Dec 09, 2007 6:07 pm

Re: Boeing 737MAX Production/Delivery Thread 2018

Mon Aug 13, 2018 2:10 am

Any idea when the Turkish 737-8MAX will be painted?
 
User avatar
WoodysAeroimag
Posts: 575
Joined: Sun Apr 26, 2015 6:21 pm

Re: Boeing 737MAX Production/Delivery Thread 2018

Mon Aug 13, 2018 3:20 am

SXDFC wrote:
Any idea when the Turkish 737-8MAX will be painted?


I’m sure it’s in paint now at BFI. I’m keeping my eye out for it.
 
User avatar
flyingclrs727
Posts: 3277
Joined: Thu Apr 19, 2007 7:44 am

Re: Boeing 737MAX Production/Delivery Thread 2018

Mon Aug 13, 2018 6:13 am

travelhound wrote:
So, at this stage the single max line is producing approximately 10 aircraft per month. At rate 52 this would be sufficient to meet demand. Does anyone know when the other two production lines will start producing max aircraft? Should be soon!


What difference does that make when CFM can't deliver engines for 10.a month?
 
VV
Posts: 2400
Joined: Sat Feb 13, 2016 1:03 pm

Re: Boeing 737MAX Production/Delivery Thread 2018

Mon Aug 13, 2018 11:29 am

Does anyone know how bad the situation is relative to CFM Leap-1B delivery?

What is the plan (CFM and Boeing) to avert a total chaos or a train wreck?
 
User avatar
WoodysAeroimag
Posts: 575
Joined: Sun Apr 26, 2015 6:21 pm

Re: Boeing 737MAX Production/Delivery Thread 2018

Mon Aug 13, 2018 9:23 pm

VV wrote:
Does anyone know how bad the situation is relative to CFM Leap-1B delivery?

What is the plan (CFM and Boeing) to avert a total chaos or a train wreck?


Production delays at Renton are not solely as a result of CFM delays. Spirit also had issues meeting the ramp up, as well as other vendors outside CFM & Spirit
 
User avatar
sunking737
Posts: 1986
Joined: Tue Feb 22, 2005 10:33 pm

Re: Boeing 737MAX Production/Delivery Thread 2018

Mon Aug 13, 2018 10:05 pm

Think of it has tossing a stone in a calm lake. A small ripple becomes a larger wave.
 
VV
Posts: 2400
Joined: Sat Feb 13, 2016 1:03 pm

Re: Boeing 737MAX Production/Delivery Thread 2018

Tue Aug 14, 2018 12:53 pm

WoodysAeroimag wrote:
VV wrote:
Does anyone know how bad the situation is relative to CFM Leap-1B delivery?

What is the plan (CFM and Boeing) to avert a total chaos or a train wreck?


Production delays at Renton are not solely as a result of CFM delays. Spirit also had issues meeting the ramp up, as well as other vendors outside CFM & Spirit


Thanks.

I guess everyone is working hard to solve the issues.

I read somewhere they're still expecting to hit the delivery target for 2018, whatever that target is.
 
User avatar
WoodysAeroimag
Posts: 575
Joined: Sun Apr 26, 2015 6:21 pm

Re: Boeing 737MAX Production/Delivery Thread 2018

Wed Aug 15, 2018 5:48 am

SXDFC wrote:
Any idea when the Turkish 737-8MAX will be painted?


It flew today painted wearing a test reg.

Picture on my twitter feed

https://twitter.com/aeroimageschris/sta ... 27266?s=21

Image
 
mjoelnir
Posts: 9894
Joined: Sun Feb 03, 2013 11:06 pm

Re: Boeing 737MAX Production/Delivery Thread 2018

Wed Aug 15, 2018 8:02 am

WoodysAeroimag wrote:
VV wrote:
Does anyone know how bad the situation is relative to CFM Leap-1B delivery?

What is the plan (CFM and Boeing) to avert a total chaos or a train wreck?


Production delays at Renton are not solely as a result of CFM delays. Spirit also had issues meeting the ramp up, as well as other vendors outside CFM & Spirit


Stored, engine less aircraft are hardly caused by fuselage delays.
 
george77300
Posts: 1132
Joined: Sat May 06, 2017 8:33 pm

Re: Boeing 737MAX Production/Delivery Thread 2018

Wed Aug 15, 2018 10:32 am

WoodysAeroimag wrote:
VV wrote:
Does anyone know how bad the situation is relative to CFM Leap-1B delivery?

What is the plan (CFM and Boeing) to avert a total chaos or a train wreck?


Production delays at Renton are not solely as a result of CFM delays. Spirit also had issues meeting the ramp up, as well as other vendors outside CFM & Spirit


Well that’s a small proportion and not the limiting factor. There are lots stored including on taxiways engineless. Hardly the fault of late fuselages or other components. The engine issues are definitely the most limiting of all.
 
User avatar
RobK
Posts: 4190
Joined: Mon Sep 06, 2004 1:43 pm

Re: Boeing 737MAX Production/Delivery Thread 2018

Wed Aug 15, 2018 1:47 pm

First Max frames for Kunming, Primera Air, Globus, 9 Air, Lucky Air and Enter Air all coming within the next couple of months. Towards the end of the year first ones for Air Pacific, Royal Air Maroc, Comair and Azerbaijan.

Also the first frames for Zhoushan begin in Q4, starting off with an Air China Max 8.
 
ssreekanth2000
Posts: 31
Joined: Fri Aug 11, 2017 1:11 am

Re: Boeing 737MAX Production/Delivery Thread 2018

Wed Aug 15, 2018 2:07 pm

RobK wrote:
First Max frames for Kunming, Primera Air, Globus, 9 Air, Lucky Air and Enter Air all coming within the next couple of months. Towards the end of the year first ones for Air Pacific, Royal Air Maroc, Comair and Azerbaijan.

Also the first frames for Zhoushan begin in Q4, starting off with an Air China Max 8.



What about SpiceJet? They are guided to receive 11 by the end of the year
 
User avatar
RobK
Posts: 4190
Joined: Mon Sep 06, 2004 1:43 pm

Re: Boeing 737MAX Production/Delivery Thread 2018

Wed Aug 15, 2018 2:12 pm

Yes, but those are already known about and posted earlier in the thread. First one is VT-MAX then the rest will be VT-MX* block.
 
User avatar
WoodysAeroimag
Posts: 575
Joined: Sun Apr 26, 2015 6:21 pm

Re: Boeing 737MAX Production/Delivery Thread 2018

Wed Aug 15, 2018 5:56 pm

ssreekanth2000 wrote:
RobK wrote:
First Max frames for Kunming, Primera Air, Globus, 9 Air, Lucky Air and Enter Air all coming within the next couple of months. Towards the end of the year first ones for Air Pacific, Royal Air Maroc, Comair and Azerbaijan.

Also the first frames for Zhoushan begin in Q4, starting off with an Air China Max 8.



What about SpiceJet? They are guided to receive 11 by the end of the year


Their 1st is in storage behind the final assembly hall awaiting engines and other components.
 
User avatar
WoodysAeroimag
Posts: 575
Joined: Sun Apr 26, 2015 6:21 pm

Re: Boeing 737MAX Production/Delivery Thread 2018

Wed Aug 15, 2018 5:58 pm

RobK wrote:
First Max frames for Kunming, Primera Air, Globus, 9 Air, Lucky Air and Enter Air all coming within the next couple of months. Towards the end of the year first ones for Air Pacific, Royal Air Maroc, Comair and Azerbaijan.

Also the first frames for Zhoushan begin in Q4, starting off with an Air China Max 8.


Kunming’s 1st is behind FAL. I’ll post a pictures later today.
 
iahcsr
Posts: 4777
Joined: Fri Jun 04, 1999 2:59 pm

Re: Boeing 737MAX Production/Delivery Thread 2018

Wed Aug 15, 2018 6:09 pm

Is there much empty space left at RNT for any more aircraft :crowded:
 
Clydenairways
Posts: 1786
Joined: Thu Jan 11, 2007 8:27 am

Re: Boeing 737MAX Production/Delivery Thread 2018

Thu Aug 16, 2018 1:21 pm

Is these any update on the landing gear strut design for the B737-10 MAX? Any better images available yet of what it will look like?
 
EduardoL
Posts: 97
Joined: Thu Feb 02, 2017 11:11 am

Re: Boeing 737MAX Production/Delivery Thread 2018

Thu Aug 16, 2018 2:15 pm

What is the forecast of MAX 10 entering the FAL?
 
User avatar
ikolkyo
Posts: 4460
Joined: Tue Nov 05, 2013 8:43 pm

Re: Boeing 737MAX Production/Delivery Thread 2018

Fri Aug 17, 2018 5:38 pm

TK #1, TC-LCA has been delivered
https://www.flightradar24.com/THY6830/1d89f538

BBJ MAX 8 VP-CMA, has been delivered
https://www.flightradar24.com/data/airc ... a#1d866ecb
 
User avatar
lightsaber
Moderator
Posts: 24641
Joined: Wed Jan 19, 2005 10:55 pm

Re: Boeing 737MAX Production/Delivery Thread 2018

Fri Aug 17, 2018 6:04 pm

iahcsr wrote:
Is there much empty space left at RNT for any more aircraft :crowded:

There are plenty of Western airfields to store max. Slap on a pair of Boeing/CFM engines and fly them to Mojave, Foxfield, Moses lake, or even EAFB to keep out of sight. I probably skipped dozens of other options...

CFM needs to make up both the LEAP-1A and -1B shortage. I'm more than aware of the PW1100 status.

Lightsaber

I should have mentioned the engines would be removed, returned, and repeated with another MAX. With a small crew and an engine lift, it is easy to remove or install engines.
 
User avatar
barney captain
Posts: 2559
Joined: Tue Nov 06, 2001 5:47 pm

Re: Boeing 737MAX Production/Delivery Thread 2018

Fri Aug 17, 2018 6:32 pm

EduardoL wrote:
What is the forecast of MAX 10 entering the FAL?


With the first delivery slated for 2020, that's a great question. Does anyone have any updated production info?
 
User avatar
WoodysAeroimag
Posts: 575
Joined: Sun Apr 26, 2015 6:21 pm

Re: Boeing 737MAX Production/Delivery Thread 2018

Sun Aug 19, 2018 1:11 am

7027 1A954 43707 XA-MAO 737-8 Aeromexico - Delivery
Image7027 1A954 43707 XA-MAO 737-8 Aeromexico by 737 MAX Production, on Flickr
 
User avatar
WoodysAeroimag
Posts: 575
Joined: Sun Apr 26, 2015 6:21 pm

Re: Boeing 737MAX Production/Delivery Thread 2018

Sun Aug 19, 2018 1:26 am

7053 1A929 43328 A4O-MD 737-8 Oman Air
Image7053 1A929 43328 A4O-MD 737-8 Oman Air by 737 MAX Production, on Flickr

7060 1B114 44456 N326RP 737-8 American Airlines
Image7060 1B114 44456 N326RP 737-8 American Airlines by 737 MAX Production, on Flickr

7064 1C332 43857 B-1137 737-8 Xiamen Airlines
Image7064 1C332 43857 B-1137 737-8 Xiamen Airlines by 737 MAX Production, on Flickr

7065 1A743 43951 B-1122 737-8 China Southern
Image7065 1A743 43951 B-1122 737-8 China Southern by 737 MAX Production, on Flickr

7070 1B653 61443 B-1120 737-8 Shandong Airlines
Image7070 1B653 61443 B-1120 737-8 Shandong Airlines by 737 MAX Production, on Flickr

7073 1A311 42836 LN-BKC 737-8 Norwegian
Image7073 1A311 42836 LN-BKC 737-8 Norwegian by 737 MAX Production, on Flickr

7075 1A744 63268 B-1127 737-8 China Southern
Image7075 1A744 63268 B-1127 737-8 China Southern by 737 MAX Production, on Flickr

7077 1A312 42834 EI-FYI 737-8 Norwegian
Image7077 1A312 42834 EI-FYI 737-8 Norwegian by 737 MAX Production, on Flickr

7080 1C402 62447 ET-AVL 737-8 Ethiopian Airlines
Image7080 1C402 62447 ET-AVL 737-8 Ethiopian Airlines by 737 MAX Production, on Flickr

7088 1C702 60033 TC-LCB 737-8 Turkish Airlines - Engines Installed
Image7088 1C702 60033 TC-LCB 737-8 Turkish Airlines by 737 MAX Production, on Flickr

7090 1A021 42548 N8721J 737-8 Southwest Airlines - Engines Installed
Image7090 1A021 42548 N8721J 737-8 Southwest Airlines by 737 MAX Production, on Flickr

7095 1C703 60034 TC-LCC 737-8 Turkish Airlines - Engines Installed
Image7095 1C703 60034 TC-LCC 737-8 Turkish Airlines by 737 MAX Production, on Flickr

7115 1A023 42574 N8723Q 737-8 Southwest Airlines
Image7115 1A023 42574 N8723Q 737-8 Southwest Airlines by 737 MAX Production, on Flickr

7118 1A211 737-8 Lion Air
Image7118 1A211 737-8 Lion Air by 737 MAX Production, on Flickr

7120 737-8 Okay Air
Image7120 737-8 Okay Air by 737 MAX Production, on Flickr

7123 737-8 Air China
Image7123 737-8 Air China by 737 MAX Production, on Flickr

7128 1C704 60035 TC-LCD 737-8 Turkish Airlines
Image7128 1C704 60035 TC-LCD 737-8 Turkish Airlines by 737 MAX Production, on Flickr

7132 1C705 60036 TC-LCF 737-8 Turkish Airlines
Image7132 1C705 60036 TC-LCF 737-8 Turkish Airlines by 737 MAX Production, on Flickr

7133 1A930 A4O-ME 737-8 Oman Air
Image7133 1A930 A4O-ME 737-8 Oman Air by 737 MAX Production, on Flickr

7138 737-8 Ethiopian Airlines
Image7138 737-8 Ethiopian Airlines by 737 MAX Production, on Flickr

7153 737-8 Southwest Airlines
Image7153 737-8 Southwest Airlines by 737 MAX Production, on Flickr
 
User avatar
lightsaber
Moderator
Posts: 24641
Joined: Wed Jan 19, 2005 10:55 pm

Re: Boeing 737MAX Production/Delivery Thread 2018

Sun Aug 19, 2018 2:08 am

flyingclrs727 wrote:
travelhound wrote:
So, at this stage the single max line is producing approximately 10 aircraft per month. At rate 52 this would be sufficient to meet demand. Does anyone know when the other two production lines will start producing max aircraft? Should be soon!


What difference does that make when CFM can't deliver engines for 10.a month?

I'll rephrase:
1. CFM, Spirit and other vendors are having issues producing at 10 MAX/month.
2. To Transition requires shutting down the line and setting up for the max, perhaps a week to reconfigure.
3. Not transitioning is an issue and vendors have contract ramp down rates. CFM tried to have vendors waive the ramp down penalties and there was a resounding rejection. For example parts are of different materials and require different machines to manufacture.

Soon Boeing will have to switch one line to the MAX as there simply isn't enough NG backlog otherwise. Traditionally vendors complete kit delivery in October, but some will end earlier. There is a few weeks to assemble and then mid-November or early December the line will switch over.

I fully expect in October LEAP engine production to catch up. I also fully expect the new line to pump out engineless MAXs at a new rate.

Lightsaber
 
CX747
Posts: 7103
Joined: Tue May 18, 1999 2:54 am

Re: Boeing 737MAX Production/Delivery Thread 2018

Sun Aug 19, 2018 2:18 am

While there is always a possibility for change, Boeing addressed the current build up of 737s. Their statement covered the fact that production would outpace deliveries in the 3rd quarter but that deliveries would catch back up and meet stated numbers before years end.

As for engine problems, it's better than the F-14 Tomcat in the early days. The USN was using the few good TF-30s to fly Tomcats cross country from Long Island to California. Upon arrival, the TF-30s would be removed and trucked back to Long Island to bring in the next F-14.
 
User avatar
WoodysAeroimag
Posts: 575
Joined: Sun Apr 26, 2015 6:21 pm

Re: Boeing 737MAX Production/Delivery Thread 2018

Sun Aug 19, 2018 3:33 am

6308 1D002 42989 N739EX 737-9 Lion Air
Image6308 1D002 42989 N739EX 737-9 Lion Air by 737 MAX Production, on Flickr

7043 1B931 61136 B-1160 737-8 Shenzhen Airlines
Image7043 1B931 61136 B-1160 737-8 Shenzhen Airlines by 737 MAX Production, on Flickr

7045 1B568 43558 VT-JXD 737-8 Jet Airways
Image7045 1B568 43558 VT-JXD 737-8 Jet Airways by 737 MAX Production, on Flickr

7077 1A312 42834 EI-FYI 737-8 Norwegian
Image7077 1A312 42834 EI-FYI 737-8 Norwegian by 737 MAX Production, on Flickr

7085 1B569 44863 VT-JXE 737-8 Jet Airways- Engines Installed
Image7085 1B569 44863 VT-JXE 737-8 Jet Airways by 737 MAX Production, on Flickr

7093 1B115 44457 N328RR 737-8 American Airlines and 7111 1A022 37019 N8722L 737-8 Southwest Airlines
Image7111 1A022 37019 N8722L 737-8 Southwest Airlines by 737 MAX Production, on Flickr

7098 1A727 62876 737-8 China Southern
Image7098 1A727 62876 737-8 China Southern by 737 MAX Production, on Flickr

7103 1C501 60644 VT-MAX 737-8 SpiceJet
Image7103 1C501 60644 VT-MAX 737-8 SpiceJet by 737 MAX Production, on Flickr

7158 737-8 Kunming Airlines
Image7158 737-8 Kunming Airlines by 737 MAX Production, on Flickr
Image7158 737-8 Kunming Airlines by 737 MAX Production, on Flickr

7160 737-8 Shandong Airlines
Image7160 737-8 Shandong Airlines by 737 MAX Production, on Flickr

5668 1A002 36989 N8702L 737-8 Southwest Airlines
Image5668 1A002 36989 N8702L 737-8 Southwest Airlines by 737 MAX Production, on Flickr
 
User avatar
WoodysAeroimag
Posts: 575
Joined: Sun Apr 26, 2015 6:21 pm

Re: Boeing 737MAX Production/Delivery Thread 2018

Sun Aug 19, 2018 3:37 am

iahcsr wrote:
Is there much empty space left at RNT for any more aircraft :crowded:


This is what it looks like around Renton as the airframes back up due to supplier delays.

ImageCompass Rose by 737 MAX Production, on Flickr

ImageOutside FAL by 737 MAX Production, on Flickr

ImageOutside FAL by 737 MAX Production, on Flickr

Image7043 1B931 61136 B-1160 737-8 Shenzhen Airlines by 737 MAX Production, on Flickr
 
FriscoHeavy
Posts: 1855
Joined: Tue May 27, 2014 4:31 pm

Re: Boeing 737MAX Production/Delivery Thread 2018

Sun Aug 19, 2018 3:55 am

Once a pair of engines have arrived and are ready for installation, how long does it take to install both of them and ‘boot them up’ for takeoff?
 
Someone83
Posts: 6258
Joined: Sun Sep 17, 2006 5:47 pm

Re: Boeing 737MAX Production/Delivery Thread 2018

Sun Aug 19, 2018 5:44 am

FriscoHeavy wrote:
Once a pair of engines have arrived and are ready for installation, how long does it take to install both of them and ‘boot them up’ for takeoff?


Consider there is quite a few MAXes standing there with engines, and has for several weeks, there is clearly other things delaying the aircraft as well
 
User avatar
RobK
Posts: 4190
Joined: Mon Sep 06, 2004 1:43 pm

Re: Boeing 737MAX Production/Delivery Thread 2018

Sun Aug 19, 2018 6:12 am

Someone83 wrote:
FriscoHeavy wrote:
Once a pair of engines have arrived and are ready for installation, how long does it take to install both of them and ‘boot them up’ for takeoff?


Consider there is quite a few MAXes standing there with engines, and has for several weeks, there is clearly other things delaying the aircraft as well


They don't fly the moment they get their engines installed... :roll: The NGs that roll out with their engines already installed typically sit in a flight line stall for 2-3 weeks before taking to the air as there are numerous pre-flight tasks to complete before they can fly. The Max frames won't be any different in that regard and from my observations once fitted with their engines they too are taking to the air approx 2-3 weeks later so your comment "clearly other things delaying the aircraft" is nonsense.
 
User avatar
WoodysAeroimag
Posts: 575
Joined: Sun Apr 26, 2015 6:21 pm

Re: Boeing 737MAX Production/Delivery Thread 2018

Sun Aug 19, 2018 1:23 pm

RobK wrote:
Someone83 wrote:
FriscoHeavy wrote:
Once a pair of engines have arrived and are ready for installation, how long does it take to install both of them and ‘boot them up’ for takeoff?


Consider there is quite a few MAXes standing there with engines, and has for several weeks, there is clearly other things delaying the aircraft as well


They don't fly the moment they get their engines installed... :roll: The NGs that roll out with their engines already installed typically sit in a flight line stall for 2-3 weeks before taking to the air as there are numerous pre-flight tasks to complete before they can fly. The Max frames won't be any different in that regard and from my observations once fitted with their engines they too are taking to the air approx 2-3 weeks later so your comment "clearly other things delaying the aircraft" is nonsense.


There are other things causing the delays. Parts of the APU exhaust are delayed, as well as critical parts in the cockpit from what a Boeing employee told me. The APU parts are also impacting the NG line as LN7106, 7091, and 7101 are missing critical APU parts as well.
 
smartplane
Posts: 1928
Joined: Fri Aug 03, 2018 9:23 pm

Re: Boeing 737MAX Production/Delivery Thread 2018

Sun Aug 19, 2018 9:01 pm

RobK wrote:
The NGs that roll out with their engines already installed typically sit in a flight line stall for 2-3 weeks before taking to the air as there are numerous pre-flight tasks to complete before they can fly. The Max frames won't be any different in that regard and from my observations once fitted with their engines they too are taking to the air approx 2-3 weeks later so your comment "clearly other things delaying the aircraft" is nonsense.

The industry focus is on just in time, minimising holding costs and interest, and working cash hard.

A constant 2-3 week delay suggests a bottleneck or two, especially as by that point, the owner has parted with over 50% of the aircraft purchase price, so is keen to settle the balance (unless funding issues) and take delivery.

The Goal by Goldratt and Cox, is a popular board and senior management read at Boeing (and Airbus), so expert minds must be tasked to shorten the 'sitting' time.
 
User avatar
WoodysAeroimag
Posts: 575
Joined: Sun Apr 26, 2015 6:21 pm

Re: Boeing 737MAX Production/Delivery Thread 2018

Mon Aug 20, 2018 3:43 am

Wing for Globus (S7 Airlines)
Image737-8 Globus by 737 MAX Production, on Flickr

7050 1C331 43830 B-1118 737-8 Xiamen Airlines - Engine Runs
Image7050 1C331 43830 B-1118 737-8 Xiamen Airlines by 737 MAX Production, on Flickr

7065 1A743 43951 B-1122 737-8 China Southern - Engine Runs
Image7065 1A743 43951 B-1122 737-8 China Southern by 737 MAX Production, on Flickr

7073 1A311 42836 LN-BKC 737-8 Norwegian
Image7073 1A311 42836 LN-BKC 737-8 Norwegian by 737 MAX Production, on Flickr

7125 1B008 A6-FMG 737-8 Flydubai
Image7125 1B008 A6-FMG 737-8 Flydubai by 737 MAX Production, on Flickr

7130 1A024 42549 N8724J 737-8 Southwest Airlines
Image7130 1A024 42549 N8724J 737-8 Southwest Airlines by 737 MAX Production, on Flickr

7133 1A930 A4O-ME 737-8 Oman Air
Image7133 1A930 A4O-ME 737-8 Oman Air by 737 MAX Production, on Flickr

7143 1A025 42575 N8725L 737-8 Southwest Airlines
Image7143 1A025 42575 N8725L 737-8 Southwest Airlines by 737 MAX Production, on Flickr

7147 737-8 Shenzhen Airlines
Image7147 737-8 Shenzhen Airlines by 737 MAX Production, on Flickr
 
User avatar
WoodysAeroimag
Posts: 575
Joined: Sun Apr 26, 2015 6:21 pm

Re: Boeing 737MAX Production/Delivery Thread 2018

Wed Aug 22, 2018 9:49 pm

7045 1B567 43558 VT-JXD 737-8 Jet Airways - First Flight
Image7045 1B567 43558 VT-JXD 737-8 Jet Airways by 737 MAX Production, on Flickr

7062 1A611 61631 B-1152 737-8 Shanghai Airlines
Image7062 1A611 61631 B-1152 737-8 Shanghai Airlines by 737 MAX Production, on Flickr

7064 1C332 43857 B-1137 737-8 Xiamen Airlines - Engine Runs
Image7064 1C332 43857 B-1137 737-8 Xiamen Airlines by 737 MAX Production, on Flickr

7065 1A742 43951 B-1122 737-8 China Southern - First Flight
Image7065 1A742 43951 B-1122 737-8 China Southern by 737 MAX Production, on Flickr

7070 1B653 61443 B-1120 737-8 Shandong Airlines - B1 Delayed
Image7070 1B653 61443 B-1120 737-8 Shandong Airlines by 737 MAX Production, on Flickr

7073 1A311 42836 LN-BKC 737-8 Norwegian
Image7073 1A311 42836 LN-BKC 737-8 Norwegian by 737 MAX Production, on Flickr

7077 1A312 42834 EI-FYI 737-8 Norwegian
Image7077 1A312 42834 EI-FYI 737-8 Norwegian by 737 MAX Production, on Flickr

7083 1A745 62873 B-1165 737-8 China Southern - Engines Installed
Image7083 1A745 62873 B-1165 737-8 China Southern by 737 MAX Production, on Flickr

7085 1B569 44863 VT-JXE 737-8 Jet Airways
Image7085 1B569 44863 VT-JXE 737-8 Jet Airways by 737 MAX Production, on Flickr

7103 1C501 60644 VT-MAX 737-8 SpiceJet - Engines Installed
Image7103 1C501 60644 VT-MAX 737-8 SpiceJet by 737 MAX Production, on Flickr

7118 1A211 737-8 Lion Air
Image7118 1A211 737-8 Lion Air by 737 MAX Production, on Flickr

7133 1A930 43794 A4O-ME 737-8 Oman Air - Engines Installed
Image7133 1A930 43794 A4O-ME 737-8 Oman Air by 737 MAX Production, on Flickr

7143 1A026 42573 N8726H 737-8 Southwest Airlines
Image7143 1A026 42573 N8726H 737-8 Southwest Airlines by 737 MAX Production, on Flickr

7148 1C334 737-8 Xiamen Airlines
Image7148 1C334 737-8 Xiamen Airlines by 737 MAX Production, on Flickr

7163 737-9 Primera Air
Image7163 737-9 Primera Air by 737 MAX Production, on Flickr

Image7163 737-9 Primera Air by 737 MAX Production, on Flickr

7111 1A022 37019 N8722L 737-8 Southwest Airlines and 7135 1A025 42575 N8725L 737-8 Southwest Airlines
Image7111 1A022 37019 N8722L 737-8 Southwest Airlines by 737 MAX Production, on Flickr
 
nikeherc
Posts: 699
Joined: Thu Sep 13, 2012 8:40 pm

Re: Boeing 737MAX Production/Delivery Thread 2018

Thu Aug 23, 2018 12:48 am

According to Uresh at All Things 787, Boeing is having problems getting seats for the Dreamliners. He seemed to speculate that perhaps that is also part of the Max problem.
 
User avatar
WoodysAeroimag
Posts: 575
Joined: Sun Apr 26, 2015 6:21 pm

Re: Boeing 737MAX Production/Delivery Thread 2018

Fri Aug 24, 2018 11:27 pm

7053 1A929 43328 A4O-MD 737-8 Oman Air - Painted
Image7053 1A929 43328 A4O-MD 737-8 Oman Air by 737 MAX Production, on Flickr

7075 1A744 63268 B-1127 737-8 China Southern - Painted
Image7075 1A744 63268 B-1127 737-8 China Southern by 737 MAX Production, on Flickr

7088 1C702 60033 TC-LCB 737-8 Turkish Airlines
Image7088 1C702 60033 TC-LCB 737-8 Turkish Airlines by 737 MAX Production, on Flickr

7090 1A021 42548 N8721J 737-8 Southwest Airlines
Image7090 1A021 42548 N8721J 737-8 Southwest Airlines by 737 MAX Production, on Flickr

7093 1B115 44457 N328RR 737-8 American Airlines
Image7093 1B115 44457 N328RR 737-8 American Airlines by 737 MAX Production, on Flickr

7095 1C703 60034 TC-LCC 737-8 Turkish Airlines - Engines Installed
Image7095 1C703 60034 TC-LCC 737-8 Turkish Airlines by 737 MAX Production, on Flickr

7111 1A022 37019 N8722L 737-8 Southwest Airlines - Engines Installed
Image7111 1A022 37019 N8722L 737-8 Southwest Airlines by 737 MAX Production, on Flickr

7115 1A023 42574 N8723Q 737-8 Southwest Airlines - Engines Installed
Image7115 1A023 42574 N8723Q 737-8 Southwest Airlines by 737 MAX Production, on Flickr

7138 1C403 737-8 Ethiopian Airlines
Image7138 1C403 737-8 Ethiopian Airlines by 737 MAX Production, on Flickr

7143 1A026 42573 N8726H 737-8 Southwest Airlines
Image7143 1A026 42573 N8726H 737-8 Southwest Airlines by 737 MAX Production, on Flickr

7145 737-8 Smartwings
Image7145 737-8 Smartwings by 737 MAX Production, on Flickr

7148 1C334 737-8 Xiamen Airlines
Image7148 1C334 737-8 Xiamen Airlines by 737 MAX Production, on Flickr

7163 737-9 Primera Air
ImageFAL by 737 MAX Production, on Flickr

7166 737-8 Globus S7 Airlines - Winglet can be seen in FAL in 1st picture and with grey tail behind Primera Air MAX
Image7166 737-8 Globus S7 Airlines by 737 MAX Production, on Flickr
ImageFAL by 737 MAX Production, on Flickr

7168 737-8 Norwegian
Image7168 737-8 Norwegian by 737 MAX Production, on Flickr

7173 1D107 43437 N37507 737-9 United Airlines
Image7173 1D107 43437 N37507 737-9 United Airlines by 737 MAX Production, on Flickr
 
User avatar
qf789
Moderator
Topic Author
Posts: 15467
Joined: Thu Feb 05, 2015 3:42 pm

Re: Boeing 737MAX Production/Delivery Thread 2018

Sun Aug 26, 2018 6:47 am

Shandong Airlines 737MAX8 B-1120 doing a touch and go at PAE while on a customer acceptance flight

Image

https://twitter.com/JenSchuld/status/10 ... 0006256640
 
User avatar
qf789
Moderator
Topic Author
Posts: 15467
Joined: Thu Feb 05, 2015 3:42 pm

Re: Boeing 737MAX Production/Delivery Thread 2018

Sun Aug 26, 2018 6:56 am

Delivered a couple days ago, Jet Airways 737MAX8 VT-JXC

https://twitter.com/FlightIntl/status/1 ... 3689753603
 
User avatar
WoodysAeroimag
Posts: 575
Joined: Sun Apr 26, 2015 6:21 pm

Re: Boeing 737MAX Production/Delivery Thread 2018

Sun Aug 26, 2018 5:14 pm

6308 1D002 42989 N739EX 737-9 Thai Lion Air
Image6308 1D002 42989 N739EX 737-9 Lion Air by 737 MAX Production, on Flickr

7053 1A929 43328 A4O-MD 737-8 Oman Air
Image7053 1A929 43328 A4O-MD 737-8 Oman Air by 737 MAX Production, on Flickr

7080 1C402 62447 ET-AVL 737-8 Ethiopian Airlines
Image7080 1C402 62447 ET-AVL 737-8 Ethiopian Airlines by 737 MAX Production, on Flickr

7096 1D051 44161 HP-9901CMP 737-9 Copa Airlines
Image7096 1D051 44161 HP-9901CMP 737-9 Copa Airlines by 737 MAX Production, on Flickr
 
User avatar
qf789
Moderator
Topic Author
Posts: 15467
Joined: Thu Feb 05, 2015 3:42 pm

Re: Boeing 737MAX Production/Delivery Thread 2018

Tue Aug 28, 2018 11:11 am

China Southern 737MAX8 B-1121 has been delivered

https://www.flightradar24.com/data/aircraft/b-1121
 
User avatar
qf789
Moderator
Topic Author
Posts: 15467
Joined: Thu Feb 05, 2015 3:42 pm

Re: Boeing 737MAX Production/Delivery Thread 2018

Tue Aug 28, 2018 4:47 pm

Ethiopian Airlines 737MAX8 ET-AVL has been delivered

https://twitter.com/flightintl/status/1 ... 59585?s=21
 
User avatar
ikolkyo
Posts: 4460
Joined: Tue Nov 05, 2013 8:43 pm

Re: Boeing 737MAX Production/Delivery Thread 2018

Tue Aug 28, 2018 4:52 pm

Sheesh, Copa needs a new livery man. It’s looking dated, I’m glad UA decided to put the Dreamliner livery on their MAX 9s
 
User avatar
lightsaber
Moderator
Posts: 24641
Joined: Wed Jan 19, 2005 10:55 pm

Re: Boeing 737MAX Production/Delivery Thread 2018

Tue Aug 28, 2018 6:23 pm

smartplane wrote:
RobK wrote:
The NGs that roll out with their engines already installed typically sit in a flight line stall for 2-3 weeks before taking to the air as there are numerous pre-flight tasks to complete before they can fly. The Max frames won't be any different in that regard and from my observations once fitted with their engines they too are taking to the air approx 2-3 weeks later so your comment "clearly other things delaying the aircraft" is nonsense.

The industry focus is on just in time, minimising holding costs and interest, and working cash hard.

A constant 2-3 week delay suggests a bottleneck or two, especially as by that point, the owner has parted with over 50% of the aircraft purchase price, so is keen to settle the balance (unless funding issues) and take delivery.

The Goal by Goldratt and Cox, is a popular board and senior management read at Boeing (and Airbus), so expert minds must be tasked to shorten the 'sitting' time.

It might be setup, use, and moving of test equipment.

Normally:. Engine install, gauntlet 1, mate connections. The above is about 2 days on the line.

No engines:. Mini gauntlet, mate (partial), tow out, unmate, install engines, gauntlet, mate.

Note: All mating is completed by the end of the gauntlet testing, it is really in parallel.

Moving this outside adds days to testing.
It should be:
Initial ground test
Fuel test/Post fuel ground testing
Taxi testing
Aborted takeoff/B1 flight
C1 flight

Each of the above should be a workday for each row. Or 1 week to delivery. NGs can beat that as any optimized process will (MAXes aren't there nor should we expect that).

This implies either rework or missing parts. At this point, I do expect a week or rework that will later be brought into the factory.

Is it one or a few customers? (Seats?)

If Spirit has travelled work going outside... Ouch. There is that possibility too... (Barrels under-stuffed?)

I'm a huge fan of barrel stuffing. It is tremendously efficient.
 
mham001
Posts: 5745
Joined: Thu Feb 03, 2005 4:52 am

Re: Boeing 737MAX Production/Delivery Thread 2018

Tue Aug 28, 2018 7:17 pm

lightsaber wrote:
It might be setup, use, and moving of test equipment.

Normally:. Engine install, gauntlet 1, mate connections. The above is about 2 days on the line.

No engines:. Mini gauntlet, mate (partial), tow out, unmate, install engines, gauntlet, mate.

Note: All mating is completed by the end of the gauntlet testing, it is really in parallel.

Moving this outside adds days to testing.
It should be:
Initial ground test
Fuel test/Post fuel ground testing
Taxi testing
Aborted takeoff/B1 flight
C1 flight

Each of the above should be a workday for each row. Or 1 week to delivery. NGs can beat that as any optimized process will (MAXes aren't there nor should we expect that).

This implies either rework or missing parts. At this point, I do expect a week or rework that will later be brought into the factory.

Is it one or a few customers? (Seats?)

If Spirit has travelled work going outside... Ouch. There is that possibility too... (Barrels under-stuffed?)

I'm a huge fan of barrel stuffing. It is tremendously efficient.


In another thread yesterday you mentioned an upcoming month-long shutdown at Renton. Can you elaborate?
 
User avatar
RobK
Posts: 4190
Joined: Mon Sep 06, 2004 1:43 pm

Re: Boeing 737MAX Production/Delivery Thread 2018

Thu Aug 30, 2018 12:25 am

mham001 wrote:
lightsaber wrote:
It might be setup, use, and moving of test equipment.

Normally:. Engine install, gauntlet 1, mate connections. The above is about 2 days on the line.

No engines:. Mini gauntlet, mate (partial), tow out, unmate, install engines, gauntlet, mate.

Note: All mating is completed by the end of the gauntlet testing, it is really in parallel.

Moving this outside adds days to testing.
It should be:
Initial ground test
Fuel test/Post fuel ground testing
Taxi testing
Aborted takeoff/B1 flight
C1 flight

Each of the above should be a workday for each row. Or 1 week to delivery. NGs can beat that as any optimized process will (MAXes aren't there nor should we expect that).

This implies either rework or missing parts. At this point, I do expect a week or rework that will later be brought into the factory.

Is it one or a few customers? (Seats?)

If Spirit has travelled work going outside... Ouch. There is that possibility too... (Barrels under-stuffed?)

I'm a huge fan of barrel stuffing. It is tremendously efficient.


In another thread yesterday you mentioned an upcoming month-long shutdown at Renton. Can you elaborate?


Where did he say this? Is lightsaber a reliable source? There are a number of self-appointed "experts" that post in these production threads from time to time and with one or two exceptions most of what they post is a load of crap.
 
User avatar
lightsaber
Moderator
Posts: 24641
Joined: Wed Jan 19, 2005 10:55 pm

Re: Boeing 737MAX Production/Delivery Thread 2018

Thu Aug 30, 2018 2:07 am

RobK wrote:
mham001 wrote:
lightsaber wrote:
It might be setup, use, and moving of test equipment.

Normally:. Engine install, gauntlet 1, mate connections. The above is about 2 days on the line.

No engines:. Mini gauntlet, mate (partial), tow out, unmate, install engines, gauntlet, mate.

Note: All mating is completed by the end of the gauntlet testing, it is really in parallel.

Moving this outside adds days to testing.
It should be:
Initial ground test
Fuel test/Post fuel ground testing
Taxi testing
Aborted takeoff/B1 flight
C1 flight

Each of the above should be a workday for each row. Or 1 week to delivery. NGs can beat that as any optimized process will (MAXes aren't there nor should we expect that).

This implies either rework or missing parts. At this point, I do expect a week or rework that will later be brought into the factory.

Is it one or a few customers? (Seats?)

If Spirit has travelled work going outside... Ouch. There is that possibility too... (Barrels under-stuffed?)

I'm a huge fan of barrel stuffing. It is tremendously efficient.


In another thread yesterday you mentioned an upcoming month-long shutdown at Renton. Can you elaborate?


Where did he say this? Is lightsaber a reliable source? There are a number of self-appointed "experts" that post in these production threads from time to time and with one or two exceptions most of what they post is a load of crap.

I pointed out the timeline to shut down one of the two NG lines to convert to MAX. That has to happen. I gave my opinion on the timeline.

You should know I am working in the industry.

Before calling another users opinion crap, please read the forums rules. I happen to know there are half a dozen true experts posting in these threads. After a while you know who has worked the industry and who hasn't.

I also posted a link in another thread about a possible line shutdown to reorganize. Have you read anything about Knudson? He revolutionized production at Chevrolet before WW2 and was in charge of US war production, which went well...

One issue is rework. At the start of production it is cheaper to undo work and then redo it. The greatest example was the Kansas City B-29 rework. All they did was rewire and change windows of Wichita built B-29s. All of them. That was a faster production ramp than fixing the B-29 plant. It is how Chevrolet out produced Ford (Ford hated rework).

To me it is obvious rework is going on for MAX production and travelled work too. But that is just my opinion.

At some point stopping production and fixing the production flow is best. That is why auto makers started model years (another Knudson innovation).

I hypothesize this should happen.

Now, other people here know a bit of my experience. If they want my opinion, please let them ask. Please read the forums rules for just calling so called expert advice as crap misses the point. There are real experts in many topics that post here.

We have experts in aircraft financing, operations, and maintenance. Those are not my specialties, but I'll still voice an opinion. We also have experts in aircraft design, test and manufacturing who post here. It will be your challenge to determine who to listen to or who to ignore.

I see production far behind schedule. It isn't just engines. Be a positive influence and post how you would fix the issue.

Lightsaber
 
User avatar
wiggy
Posts: 442
Joined: Sat Jun 16, 2018 9:23 am

Re: Boeing 737MAX Production/Delivery Thread 2018

Thu Aug 30, 2018 2:31 am

when does virgin australia receive their first max
 
iahcsr
Posts: 4777
Joined: Fri Jun 04, 1999 2:59 pm

Re: Boeing 737MAX Production/Delivery Thread 2018

Thu Aug 30, 2018 5:26 am

lightsaber wrote:
RobK wrote:
mham001 wrote:

In another thread yesterday you mentioned an upcoming month-long shutdown at Renton. Can you elaborate?


Where did he say this? Is lightsaber a reliable source? There are a number of self-appointed "experts" that post in these production threads from time to time and with one or two exceptions most of what they post is a load of crap.

I pointed out the timeline to shut down one of the two NG lines to convert to MAX. That has to happen. I gave my opinion on the timeline.

You should know I am working in the industry.

Before calling another users opinion crap, please read the forums rules. I happen to know there are half a dozen true experts posting in these threads. After a while you know who has worked the industry and who hasn't.

I also posted a link in another thread about a possible line shutdown to reorganize. Have you read anything about Knudson? He revolutionized production at Chevrolet before WW2 and was in charge of US war production, which went well...

One issue is rework. At the start of production it is cheaper to undo work and then redo it. The greatest example was the Kansas City B-29 rework. All they did was rewire and change windows of Wichita built B-29s. All of them. That was a faster production ramp than fixing the B-29 plant. It is how Chevrolet out produced Ford (Ford hated rework).

To me it is obvious rework is going on for MAX production and travelled work too. But that is just my opinion.

At some point stopping production and fixing the production flow is best. That is why auto makers started model years (another Knudson innovation).

I hypothesize this should happen.

Now, other people here know a bit of my experience. If they want my opinion, please let them ask. Please read the forums rules for just calling so called expert advice as crap misses the point. There are real experts in many topics that post here.

We have experts in aircraft financing, operations, and maintenance. Those are not my specialties, but I'll still voice an opinion. We also have experts in aircraft design, test and manufacturing who post here. It will be your challenge to determine who to listen to or who to ignore.

I see production far behind schedule. It isn't just engines. Be a positive influence and post how you would fix the issue.

Lightsaber

Speaking only for myself I shall simply wait and watch what Boeing does to sort out the various issues involved. I’m sure hindsight will bring much Monday morning quarterbacking (sorry to non-Yanks :scratchchin: )
 
User avatar
qf789
Moderator
Topic Author
Posts: 15467
Joined: Thu Feb 05, 2015 3:42 pm

Re: Boeing 737MAX Production/Delivery Thread 2018

Thu Aug 30, 2018 7:43 am

wiggy wrote:
when does virgin australia receive their first max


First delivery is November 2019

Popular Searches On Airliners.net

Top Photos of Last:   24 Hours  •  48 Hours  •  7 Days  •  30 Days  •  180 Days  •  365 Days  •  All Time

Military Aircraft Every type from fighters to helicopters from air forces around the globe

Classic Airliners Props and jets from the good old days

Flight Decks Views from inside the cockpit

Aircraft Cabins Passenger cabin shots showing seat arrangements as well as cargo aircraft interior

Cargo Aircraft Pictures of great freighter aircraft

Government Aircraft Aircraft flying government officials

Helicopters Our large helicopter section. Both military and civil versions

Blimps / Airships Everything from the Goodyear blimp to the Zeppelin

Night Photos Beautiful shots taken while the sun is below the horizon

Accidents Accident, incident and crash related photos

Air to Air Photos taken by airborne photographers of airborne aircraft

Special Paint Schemes Aircraft painted in beautiful and original liveries

Airport Overviews Airport overviews from the air or ground

Tails and Winglets Tail and Winglet closeups with beautiful airline logos