FromCDGtoSYD
Topic Author
Posts: 1038
Joined: Sat Mar 11, 2017 9:29 am

ICN terminal 2 to open 18th of January 2018

Sat Dec 09, 2017 7:44 am

Not exactly breaking news but :

Incheon airport T2 set to open the 18th of Jan 2018.

http://www.nationmultimedia.com/Recommended/business/99

http://www.koreaherald.com/view.php?ud=20171129000910

Interesting to note that KE will finally have priority queues for immigration and security, on top of having an "exclusive" first class lounge (instead of a replica of a business class lounge).

KE will also have enough A380 gates to not have to use the satellite terminal for SYD flights during the christmas season
 
konkret
Posts: 409
Joined: Thu Jun 23, 2016 9:26 pm

Re: ICN terminal 2 to open 18th of January 2018

Sat Dec 09, 2017 11:57 am

Is there a plan for other Skyteam airlines to move to T2? What about Jin Air?
 
Block40Osan
Posts: 31
Joined: Mon Feb 11, 2013 12:23 pm

Re: ICN terminal 2 to open 18th of January 2018

Sat Dec 09, 2017 2:00 pm

konkret wrote:
Is there a plan for other Skyteam airlines to move to T2? What about Jin Air?


Initially KE, DL, AF, KL are planned to move to T2. Surprisingly GA and VN will still be using the current concourse 1. Weren't they the SkyTeam member also? LOL :o
 
NZ321
Posts: 2154
Joined: Fri Jul 31, 2015 8:00 pm

Re: ICN terminal 2 to open 18th of January 2018

Sat Dec 09, 2017 2:24 pm

How many gates?
 
konkret
Posts: 409
Joined: Thu Jun 23, 2016 9:26 pm

Re: ICN terminal 2 to open 18th of January 2018

Sat Dec 09, 2017 2:31 pm

I am a bit surprised CSA doesn’t move along with Korean Air.
 
User avatar
bluefltspecial
Posts: 619
Joined: Fri Sep 20, 2013 6:27 pm

Re: ICN terminal 2 to open 18th of January 2018

Sat Dec 09, 2017 5:21 pm

I still think it was short-sighted of them to build Terminal 2 so far south. It should have been built farther to the north closer to the water allowing for additional concourses at a later point, now they can only build 1 additional concourse midfield. I'm sure the can build additional expansions along the sides but just seems wasteful.
 
xjetflyer2001
Posts: 358
Joined: Wed Sep 21, 2016 6:20 pm

Re: ICN terminal 2 to open 18th of January 2018

Sat Dec 09, 2017 7:46 pm

bluefltspecial wrote:
I still think it was short-sighted of them to build Terminal 2 so far south. It should have been built farther to the north closer to the water allowing for additional concourses at a later point, now they can only build 1 additional concourse midfield. I'm sure the can build additional expansions along the sides but just seems wasteful.


I was looking at that too, but it still looks to me as if they might be able to fit 2 more concourses in, if they build a new concourse where the midfield control tower is currently, and squeeze the distance a bit between the concourses, that might allow room for 2 concourses to be built, but I agree, they definitely should have built T2 further North, then it would be a non-issue and they could have added maybe 3 or 4 new concourses between the Two.
 
User avatar
jsnww81
Posts: 2556
Joined: Mon Jan 28, 2002 3:29 am

Re: ICN terminal 2 to open 18th of January 2018

Sat Dec 09, 2017 8:15 pm

Am I crazy for thinking Terminal 2 doesn't look big enough for all of Korean Air's operations?

Don't get me wrong, this is a huge improvement and I'm thrilled whenever see airports expanding (especially since we in North America seem to have lost the art and have adopted Europe's lipstick-on-a-pig approach) but this doesn't look like a ton of gates. No wonder all the Skyteam members aren't moving over.
 
User avatar
Devilfish
Posts: 7990
Joined: Tue Jan 24, 2006 7:52 am

Re: ICN terminal 2 to open 18th of January 2018

Sat Dec 09, 2017 11:00 pm

The transportation center is very impressive..... :wideeyed: .....

Image
http://www.airport.kr/images/en/sub/CO_ ... g03_en.jpg
 
airtechy
Posts: 833
Joined: Sun Dec 24, 2006 7:35 am

Re: ICN terminal 2 to open 18th of January 2018

Sat Dec 09, 2017 11:26 pm

Really looking forward to transiting through this new terminal. After DL dropped NRT-BKK, my transition point US-BKK has been ICN. This should improve that experience a lot. :)
 
jumbojet
Posts: 2957
Joined: Mon Dec 29, 2003 3:01 am

Re: ICN terminal 2 to open 18th of January 2018

Sat Dec 09, 2017 11:30 pm

jsnww81 wrote:
Am I crazy for thinking Terminal 2 doesn't look big enough for all of Korean Air's operations?

Don't get me wrong, this is a huge improvement and I'm thrilled whenever see airports expanding (especially since we in North America seem to have lost the art and have adopted Europe's lipstick-on-a-pig approach) but this doesn't look like a ton of gates. No wonder all the Skyteam members aren't moving over.



I just passed through ICN. I read that eventually there will be a third terminal built.
 
jubguy3
Posts: 514
Joined: Sat Jul 29, 2017 6:18 am

Re: ICN terminal 2 to open 18th of January 2018

Sun Dec 10, 2017 12:29 am

Eventually another midfield concourse will be built between the new terminal 2 and existing satellite terminal.
 
FromCDGtoSYD
Topic Author
Posts: 1038
Joined: Sat Mar 11, 2017 9:29 am

Re: ICN terminal 2 to open 18th of January 2018

Sun Dec 10, 2017 1:52 am

jsnww81 wrote:
Am I crazy for thinking Terminal 2 doesn't look big enough for all of Korean Air's operations?

Don't get me wrong, this is a huge improvement and I'm thrilled whenever see airports expanding (especially since we in North America seem to have lost the art and have adopted Europe's lipstick-on-a-pig approach) but this doesn't look like a ton of gates. No wonder all the Skyteam members aren't moving over.


KE kind of gets ~10 more gates with the move. With AF and KL only flying 1x daily and DL only 3x it should be enough. Room was also left on both sides if the terminal to expand and create another 10 gates down the road if need be.
 
qantas747
Posts: 389
Joined: Wed Mar 29, 2000 12:51 pm

Re: ICN terminal 2 to open 18th of January 2018

Sun Dec 10, 2017 4:38 am

Will these mean that more flights will move from GMP to ICN? Or is the long term plan to keep GMP open as a short haul type airport?
 
EddieDude
Posts: 7048
Joined: Fri Nov 14, 2003 10:19 am

Re: ICN terminal 2 to open 18th of January 2018

Sun Dec 10, 2017 8:12 am

Block40Osan wrote:
Initially KE, DL, AF, KL are planned to move to T2. Surprisingly GA and VN will still be using the current concourse 1. Weren't they the SkyTeam member also? LOL :o

How about AM?
 
c152sy
Posts: 178
Joined: Wed Sep 09, 2015 12:26 pm

Re: ICN terminal 2 to open 18th of January 2018

Sun Dec 10, 2017 10:27 am

qantas747 wrote:
Will these mean that more flights will move from GMP to ICN? Or is the long term plan to keep GMP open as a short haul type airport?


I’ve not seen any official plan but I suspect not. Gimpo is far more convenient that Incheon for those living in Seoul, and thus it will continue to be the capital’s domestic air hub. I also suspect the number of international flights won’t decrease either.
 
FromCDGtoSYD
Topic Author
Posts: 1038
Joined: Sat Mar 11, 2017 9:29 am

Re: ICN terminal 2 to open 18th of January 2018

Sun Dec 10, 2017 12:06 pm

c152sy wrote:
qantas747 wrote:
Will these mean that more flights will move from GMP to ICN? Or is the long term plan to keep GMP open as a short haul type airport?


I’ve not seen any official plan but I suspect not. Gimpo is far more convenient that Incheon for those living in Seoul, and thus it will continue to be the capital’s domestic air hub. I also suspect the number of international flights won’t decrease either.


Gimpo is going through a huge renovation of all 3 terminals suggesting domestic flights aren't going anywhere. Furthermore international flights have been capped at Tokyo/Osaka/Beijing/Shanghai/Taipei and are much more convenient than their ICN counterparts
 
User avatar
DKTraveller
Posts: 5
Joined: Tue Nov 22, 2016 2:51 am

Re: ICN terminal 2 to open 18th of January 2018

Sun Dec 10, 2017 12:30 pm

How about AREX / KTX connections from T2 ?
Hopefully available from opening date to Seoul Station and KTX network.
 
BuildingMyBento
Posts: 289
Joined: Mon Jan 30, 2017 3:18 am

Re: ICN terminal 2 to open 18th of January 2018

Sun Dec 10, 2017 2:07 pm

Looking post-modern (see: more and more Chinese airports) does not a pleasant experience make.

ICN is a vastly overrated hub. The security area is tight, smoke from the smoking "lounges" regularly seeps out, seating is scarce, and post-security food options are a let-down-- while on my way to ICN, I've stopped at GMP just to eat.
 
FromCDGtoSYD
Topic Author
Posts: 1038
Joined: Sat Mar 11, 2017 9:29 am

Re: ICN terminal 2 to open 18th of January 2018

Sun Dec 10, 2017 5:01 pm

DKTraveller wrote:
How about AREX / KTX connections from T2 ?
Hopefully available from opening date to Seoul Station and KTX network.


Terminus moved from T1 transport center to T2 transport center. Buses will also be based in T2 transport center before making a stop at arrivals in T1.
 
402679
Posts: 223
Joined: Tue Dec 09, 2014 8:18 pm

Re: ICN terminal 2 to open 18th of January 2018

Sun Dec 10, 2017 5:08 pm

BuildingMyBento wrote:
Looking post-modern (see: more and more Chinese airports) does not a pleasant experience make.

ICN is a vastly overrated hub. The security area is tight, smoke from the smoking "lounges" regularly seeps out, seating is scarce, and post-security food options are a let-down-- while on my way to ICN, I've stopped at GMP just to eat.


Do you go to GMP to build your bento? :P
 
NichCage
Posts: 916
Joined: Wed Jun 22, 2016 6:43 pm

Re: ICN terminal 2 to open 18th of January 2018

Sun Dec 10, 2017 10:57 pm

So I assume the main building will be for Asiana Airlines, The Satellite Terminal will be for oneworld/unaffiliated airlines, and Terminal 2 will be for Korean Air and eventually every other SkyTeam airline? Nice terminal it seems like.

Was ICN congested terminal wise before the Terminal 2 opening? Were there enough gates for KE even with OZ using the main terminal as well?
 
ADL77W
Posts: 16
Joined: Mon Apr 06, 2015 9:59 am

Re: ICN terminal 2 to open 18th of January 2018

Sun Dec 10, 2017 11:41 pm

NichCage wrote:
So I assume the main building will be for Asiana Airlines, The Satellite Terminal will be for oneworld/unaffiliated airlines, and Terminal 2 will be for Korean Air and eventually every other SkyTeam airline? Nice terminal it seems like.

Was ICN congested terminal wise before the Terminal 2 opening? Were there enough gates for KE even with OZ using the main terminal as well?


Yeah, it is pretty crowded these days. Security feels like it has been getting slower and you do occasionally now see Korean Air in the satellite. Asiana won't even get close to filling T1 by itself, so my guess is you'll see a lot of premium foreign airlines moving into T1 and the LCCs staying in the concourse. Cathay are about to revamp their ICN lounge, so I'd imagine that will be in T1 and they'd be one of the airlines moving...
 
WPvsMW
Posts: 2252
Joined: Thu Mar 23, 2017 7:30 pm

Re: ICN terminal 2 to open 18th of January 2018

Thu Feb 22, 2018 9:54 pm

 
EddieDude
Posts: 7048
Joined: Fri Nov 14, 2003 10:19 am

Re: ICN terminal 2 to open 18th of January 2018

Fri Feb 23, 2018 1:03 am

Wow! Congrats to ICN and KE! Would love to visit soon!
 
CZ326
Posts: 50
Joined: Fri Dec 20, 2013 2:28 pm

Re: ICN terminal 2 to open 18th of January 2018

Fri Feb 23, 2018 1:25 am

What a relief for ICN to finally open terminal 2. I was at ICN 6 days before the opening and I could see that T1 was extremely saturated. Took me around an hour to pass security and outbound immigration.
 
User avatar
gatibosgru
Posts: 2357
Joined: Thu Oct 18, 2007 2:48 pm

Re: ICN terminal 2 to open 18th of January 2018

Fri Feb 23, 2018 1:34 am

Looks awesome! I'm flying in from PEK to ICN next month, hope it is on T2!
 
Yahnih
Posts: 128
Joined: Wed Jul 05, 2017 7:07 am

Re: ICN terminal 2 to open 18th of January 2018

Fri Feb 23, 2018 1:46 am

Star Alliance carriers moved to T1 with Asiana.
 
jubguy3
Posts: 514
Joined: Sat Jul 29, 2017 6:18 am

Re: ICN terminal 2 to open 18th of January 2018

Fri Feb 23, 2018 1:49 am

gatibosgru wrote:
Looks awesome! I'm flying in from PEK to ICN next month, hope it is on T2!


What airline will you be using?
 
hz747300
Posts: 2558
Joined: Thu Mar 11, 2004 11:38 pm

Re: ICN terminal 2 to open 18th of January 2018

Fri Feb 23, 2018 1:56 am

BuildingMyBento wrote:
Looking post-modern (see: more and more Chinese airports) does not a pleasant experience make.

ICN is a vastly overrated hub. The security area is tight, smoke from the smoking "lounges" regularly seeps out, seating is scarce, and post-security food options are a let-down-- while on my way to ICN, I've stopped at GMP just to eat.


Fly CX or TG to ICN from HKG. 90% of the time CX uses the satellite terminal. So delighted to see they had a Taco Bell there! I find ICN pretty nice to use, but to each his own. One that can use some modernization, is NRT the JAL/AA/CX terminal, or CX on the China Airlines/CX side.
 
AA737-823
Posts: 5697
Joined: Wed Mar 01, 2000 11:10 am

Re: ICN terminal 2 to open 18th of January 2018

Fri Feb 23, 2018 2:33 am

I flew through new ICN Terminal 2 last week.
It is BEAUTIFUL. Absolutely gorgeous. And I don't know what BulidingMyBento's problem is- I've enjoyed every single one of my transits through Incheon.
But I DO agree that food options are unacceptably few and small. It's going to be a big problem.
There were basically three tiny bars (per half of the terminal U-shape) to get food at, they were each overcrowded, and only offer a few items. Fish and Chips, serving fish and chips and basically nothing else, a noodle bar, and the "grill," which served pasta and a couple of other items.
The food I had was indeed good, but the terminal was hardly crowded at all.
They certainly didn't skimp on the name-brand shopping options. I guess those must be more profitable per square meter than restaurants????
The transit hotel is fantastic, BUT, the motion-sensitive light in the room turns on and off even while you're sleeping. The front desk told me that it's too sensitive, and sees motion in the hallway through the gap under the room's entry door. That DESPERATELY needs to be fixed.
 
flydude380
Posts: 259
Joined: Tue Nov 07, 2017 4:43 pm

Re: ICN terminal 2 to open 18th of January 2018

Fri Feb 23, 2018 8:49 am

Now, they’ll need a terminal for Asiana and Star Alliance members :D
 
Yahnih
Posts: 128
Joined: Wed Jul 05, 2017 7:07 am

Re: ICN terminal 2 to open 18th of January 2018

Fri Feb 23, 2018 10:44 am

flydude380 wrote:
Now, they’ll need a terminal for Asiana and Star Alliance members :D


They took over Terminal 1
 
flydude380
Posts: 259
Joined: Tue Nov 07, 2017 4:43 pm

Re: ICN terminal 2 to open 18th of January 2018

Fri Feb 23, 2018 12:06 pm

Yahnih wrote:
flydude380 wrote:
Now, they’ll need a terminal for Asiana and Star Alliance members :D


They took over Terminal 1


But where will the missilaneous (spelling?) carriers go? :D
 
User avatar
gatibosgru
Posts: 2357
Joined: Thu Oct 18, 2007 2:48 pm

Re: ICN terminal 2 to open 18th of January 2018

Fri Feb 23, 2018 12:54 pm

jubguy3 wrote:
gatibosgru wrote:
Looks awesome! I'm flying in from PEK to ICN next month, hope it is on T2!


What airline will you be using?



KE
 
jubguy3
Posts: 514
Joined: Sat Jul 29, 2017 6:18 am

Re: ICN terminal 2 to open 18th of January 2018

Fri Feb 23, 2018 1:29 pm

gatibosgru wrote:
jubguy3 wrote:
gatibosgru wrote:
Looks awesome! I'm flying in from PEK to ICN next month, hope it is on T2!


What airline will you be using?



KE


Great! KE moved to terminal 2 along with SkyTeam partners Delta, Air France, and KLM. Other partners will move later.
 
User avatar
PolarRoute
Posts: 147
Joined: Tue Jan 30, 2018 3:56 pm

Re: ICN terminal 2 to open 18th of January 2018

Sat Feb 24, 2018 5:43 pm

bluefltspecial wrote:
I still think it was short-sighted of them to build Terminal 2 so far south. It should have been built farther to the north closer to the water allowing for additional concourses at a later point, now they can only build 1 additional concourse midfield. I'm sure the can build additional expansions along the sides but just seems wasteful.


The new terminal isn't fully built. So that 'wasted space' in the far North is reserved to be used for when they deploy the expansion plan 'stage 4', at which the T2 is finally fully built, due in 2023.
Below are the bird's eye view of ICN expansion plans; the current stage 3 and 2023 stage 4 respectively. Note 'the other part' of T2 in the lower picture stretching all the way up north.

Image

Image
Last edited by PolarRoute on Sat Feb 24, 2018 5:48 pm, edited 1 time in total.
 
User avatar
PolarRoute
Posts: 147
Joined: Tue Jan 30, 2018 3:56 pm

Re: ICN terminal 2 to open 18th of January 2018

Sat Feb 24, 2018 5:44 pm

bluefltspecial wrote:
I still think it was short-sighted of them to build Terminal 2 so far south. It should have been built farther to the north closer to the water allowing for additional concourses at a later point, now they can only build 1 additional concourse midfield. I'm sure the can build additional expansions along the sides but just seems wasteful.


The new terminal isn't fully built. So that 'wasted space' in the far North is reserved to be used for when they deploy the expansion plan 'stage 4', at which the T2 is finally fully built, due in 2023.
Below are the bird's eye view of ICN expansion plans; the current stage 3 and 2023 stage 4 respectively. Note 'the other part' of T2 in the lower picture stretching all the way up north.

Image

Image

edit : I accidentally hit the submit button twice and this got posted twice. I tried to delete one but it wouldn't let me do so. So apologies for that.

Popular Searches On Airliners.net

Top Photos of Last:   24 Hours  •  48 Hours  •  7 Days  •  30 Days  •  180 Days  •  365 Days  •  All Time

Military Aircraft Every type from fighters to helicopters from air forces around the globe

Classic Airliners Props and jets from the good old days

Flight Decks Views from inside the cockpit

Aircraft Cabins Passenger cabin shots showing seat arrangements as well as cargo aircraft interior

Cargo Aircraft Pictures of great freighter aircraft

Government Aircraft Aircraft flying government officials

Helicopters Our large helicopter section. Both military and civil versions

Blimps / Airships Everything from the Goodyear blimp to the Zeppelin

Night Photos Beautiful shots taken while the sun is below the horizon

Accidents Accident, incident and crash related photos

Air to Air Photos taken by airborne photographers of airborne aircraft

Special Paint Schemes Aircraft painted in beautiful and original liveries

Airport Overviews Airport overviews from the air or ground

Tails and Winglets Tail and Winglet closeups with beautiful airline logos